Language :

Procedimiento de alineación de la instalación de la válvula rotativa

ROTARY VALVE Installation Alignment Procedure

H1: Laser Alignment Protocol for ROTARY VALVE Systems
5-Step Process:

  1. Clean flange faces (Ra <3.2μm)

  2. Mount dial indicators on drive shaft

  3. Adjust motor base shims (0.05mm precision)

  4. Verify runout <0.1mm TIR

  5. Perform hot alignment check after 24hrs

Tolerance Standards:

  • Parallel Misalignment: <0.05mm

  • Angular Misalignment: <0.1°